• All 6 Types Compared

Loft Conversion Types

Six ways up. Your roof rules out four of them.

Every loft conversion is one of these six. Which ones are actually available to you comes down to your ridge height, whether your roof has a hip, and how much permitted development volume you have left. Our team provides fixed-price conversions across the North West.

3 Weeks Fastest build
6 Weeks Largest build
46 m² Largest option
40–50m³ PD volume limit
No obligation·Free CAD design·400+ finished lofts
Step 1 / 3

Book your free survey

What kind of property is it? This tells us which conversion types are possible before we visit.

All six, side by side.

Timelines and floor areas are typical for North West houses. Exact fixed quote given on survey.

What each one actually is.

Velux

3 weeks on site • 3 weeks · 18–22 m²
01

Rooflights are cut into the existing roof slope and nothing else about the roof changes. It is the cheapest and quickest conversion, and because the profile stays as it is, planning permission is rarely a question.

  • Needs 2.2m from the joists to the underside of the ridge — 2.4m on modern trusses
  • You keep the sloping eaves, so usable floor area is roughly half a dormer’s
  • Almost always permitted development, even in most conservation areas
Velux in detail

Rear Dormer

4 weeks on site • 4 weeks · 28–32 m²
02

A flat-roof box built out across the rear slope. It gives more usable floor area than any other single-elevation option, with straight walls and full standing height where a rooflight room would have eaves.

  • The default choice for a mid-terrace, which has no hip to square off
  • Must sit 200mm back from the original eaves and stay under the existing ridge
  • Party wall notices needed where it meets a shared wall — two months’ notice
Rear Dormer in detail

Hip-to-Gable

3.5 weeks on site • 3.5 weeks · 25–28 m²
03

The sloping side of the roof is built up into a vertical gable wall. Its real value is often structural rather than spatial: squaring off the hip is what creates the headroom a compliant staircase and landing need.

  • Only for houses with a hipped roof — semis, detached and most end-terraces
  • New gable must match the original in brick, render, tile or slate
  • Frequently paired with a rear dormer, which makes it a wrap around
Hip-to-Gable in detail

Hip-End Dormer

3.5 weeks on site • 3.5 weeks · 24–28 m²
04

A dormer inserted into the hipped end rather than the rear slope. You gain less floor area than a full gable but the roof keeps its original shape — which matters on a matched pair or inside a conservation area.

  • Cheeks finished in hanging tiles matched to the roof, not render
  • The option when the rear slope is short, overlooked or already used
  • Permission normally required where the hipped end faces a highway
Hip-End Dormer in detail

Wrap Around

6 weeks on site • 6 weeks · 40–46 m²
05

A hip-to-gable and a rear dormer built as one, wrapping the new floor around the corner. It is the largest conversion available and the only one that regularly delivers a genuine second floor rather than one big room.

  • Around 40–46 m² — comfortably two bedrooms and a bathroom
  • Usually consumes the whole 50m³ allowance, so planning is more likely
  • Six weeks on site, and the most technical build of the six
Wrap Around in detail

Roof-Lift

6–8 weeks on site • 6–8 weeks · full floor
06

The existing roof is removed and rebuilt higher or at a steeper pitch, creating headroom where there was none. It is the answer for bungalows, chalets and shallow-pitch houses that cannot otherwise be converted.

  • Needs full planning permission — raising the ridge is never permitted development
  • A temporary weatherproof scaffold roof covers the house throughout
  • Always priced against a ceiling drop first, which is often the cheaper fix
Roof-Lift in detail

Four questions decide it.

You can answer three of these yourself. The fourth needs a tape measure, which is what the survey is for.

QUESTION 01

How tall is your loft?

Measure from the ceiling joists to the underside of the ridge. Under 2.2m and only a roof-lift or a ceiling drop will work; over it, everything is open.

The one that needs a tape measure
QUESTION 02

Does your roof have a hip?

A hip slopes on the side as well as front and back. If yours does, hip-to-gable, hip-end dormer and wrap around are all available. A mid-terrace has none.

Look at it from the street
QUESTION 03

How much volume is left?

Permitted development allows 40m³ on a terrace and 50m³ on a semi or detached — covering every roof enlargement ever made to the house.

Previous dormers count against it
QUESTION 04

What do you need the space for?

One bright room is a rooflight conversion. Two bedrooms and a bathroom is a wrap around. Answering this honestly saves more money than anything else.

Rooms, not square metres

Still not sure which one?

That is the surveyor's job. We measure the roof, price the two or three that are genuinely possible, and tell you which we would choose.

Free survey booking

Book your free survey

Step 1 / 3

What kind of property is it?

Select your house type to check possible conversion options.

Forty-one towns across the North West.

We cover Preston, Manchester, Lancashire and Cheshire. Pick your town for local prices, recent projects and planning notes.

41 Towns covered
400+ Conversions completed
5 days Typical wait for a survey

We name the type your roof can take.

Not the most expensive one. Forty-five minutes, a CAD drawing you keep, one fixed price.

  1. 01 The survey Ridge height, hips, volume already used, staircase route. 45 min
  2. 02 CAD design + fixed quote A drawing of the finished layout and one written price. A few days
  3. 03 You decide Amend it, sit on it, or book a start date. No chasing from us. Your call

No deposit, no obligation, and the drawings stay yours whatever you decide.

👋 Have a question? Chat with Alex