Wrap Around Loft Conversions
Hip-to-gable and rear dormer combined — the largest option available.
The roof is squared off on the side and extended across the back, wrapping the new floor around the corner to create two full bedrooms and a bathroom.
Book your free survey
What kind of property is it? This tells us which conversion types are possible before we visit.
Wrap arounds we've finished
What 8 to 10 weeks looks like
- Weeks 1–2 Scaffold up, loft cleared, hipped roof stripped and hip taken down. Steels and materials delivered.
- Weeks 3–4 New gable wall built up in matching brick/render, structural steels and floor joists in.
- Weeks 5–6 Rear slope opened, full-width dormer framed, flat roofed, and made watertight with roof tiles extended.
- Weeks 7–8 Windows fitted, high-spec insulation, stairwell cut, bespoke staircase and internal partitions framed.
- Weeks 9–10 Plastering, en-suite plumbing & second-fix electrics, Building Control sign-off and final handover.
What £55,000 includes — and what pushes it up
Wrap around conversions run £55,000–£75,000+ across the UK in 2026 for around 45 m². North West build costs sit below that average, and our starting figure is a real fixed price, not a teaser.
- Structural steels, calculations and engineer’s sign-off
- New gable wall built in matching brick, block or render
- Full-width rear dormer, insulated and tile-hung or rendered
- Single-ply or GRP flat roof with manufacturer guarantee
- Roof extended over the new gable with matching tiles or slate
- Bespoke staircase, landing and fire-rated doors to the protected stair
- Insulation, plasterboard, skim and second-fix electrics throughout
- Building Control fees, structural calculations and completion certificate
- En-suite shower room
- + £5,000 – £6,000
- Full bathroom instead of a shower room
- + Quoted per spec
- Planning application
- + Quoted per spec
- Juliet balcony or French doors
- + £2,500 – £5,000
- Upgraded finishes
- Quoted per spec
On a wrap around most customers take one. Cheaper near the existing soil stack.
A bath needs extra floor loading and more plumbing than a shower room.
Where the design exceeds your volume allowance. Drawings, fees and submission handled by us.
Almost always turns the scheme into a planning application.
Engineered timber floors, fitted wardrobes, feature lighting. Standard spec is included above.
Ranges reflect 2026 UK market rates. Your survey converts them into one fixed figure — nothing is added later.
Will a wrap around fit your roof?
We check the hip, the rear slope and calculate your volume allowance. Three steps to book.
Before you decide.
Answers on planning permission, volume limits, two-bedroom layouts and cost. Anything else, ask the surveyor — the visit is free whether you go ahead or not.
More often than the other types. Combining a hip-to-gable with a rear dormer frequently uses the whole 50m³ permitted development allowance, and anything beyond it needs a full application. Where the design stays inside the limit, sits 200mm back from the eaves and does not exceed the ridge, it can still be permitted development. We calculate the volume exactly at the survey and tell you which route you are on before you commit.
Typically 40 to 46 m² — comfortably two bedrooms and a bathroom, or a master suite with a dressing area and a second room. It is the only conversion type that regularly delivers a genuine second-floor layout rather than one big room.
Semis, detached houses and end-terraces with a hipped roof and a rear slope worth building into. A mid-terrace has no hip, so a rear dormer alone is the option there. Bungalows with a shallow pitch are assessed for dormer feasibility.
Typically 8 to 10 weeks on site. Weeks one to three are structure — hip down, gable up, steels in. Weeks four and five are the dormer and making everything watertight. Weeks six to ten are staircase, partitions, plaster, plumbing and sign-off.
More, and it is fair to plan for that. Two elevations are open at different points, the scaffold is up longer, and there are perhaps four genuinely noisy days rather than two. Access is still through the scaffold and rear hoist, the loft stays sealed off, and almost everyone stays in the house throughout.
Our structural engineer produces full calculations and beam bearing specifications for Building Control approval before any works begin on site, ensuring complete structural integrity and peace of mind.
It is possible but rarely economical. Two scaffolds, two sets of drawings, two Building Control applications and the second job disturbs the first job’s finishes. If budget is the constraint, a hip-to-gable now with the dormer designed in for later is the cleaner way to stage it.
A conversion that adds two bedrooms and a bathroom is the highest-value addition available to a typical North West house — usually well above the 15% to 20% that loft conversions add on average. It also changes which buyers your house appeals to when you sell.